Additional Material Request Report
The Additional Material Request Report provides visibility into materials requested outside the standard Bill of Materials (BOM). This is a critical tool for production managers to audit unexpected material consumption, track replacements for scrapped items, or monitor the usage of auxiliary components.
By linking these requests directly to a Production Order (PO), the system enables precise cost tracking for every manufacturing job.
1. Generating a Report
To begin your analysis, use the search and filter options in the top toolbar:
Filter Options
- Report Period: Select the date range to look for historical requests.
- Production Order: Use the dropdown to select a specific PO Number. This will isolate all additional requests associated with that specific production run.
- Get Report: Click this button to pull the latest transactional data.
2. Report Modes
Toggle between Summary and Detail views to change the level of information displayed:
Summary Mode (Transactional)
Use this for a high-level overview of total request volume.
- Entry No & Date: Transaction identification.
- PO Number: The Production Order the request was charged against.
- Status: The overall state of the request (e.g., Pending, Approved, Delivered).
- Total Items: A count of distinct parts in the request.
Detail Mode (Audit-Ready)
Use this for in-depth troubleshooting of material usage.
- Part Details: Specific Name, No, and UOM.
- Request Reason: The justification provided by the production floor for the extra material.
- Reject Reason: If a request was denied by the store, the explanation is logged here.
- Approval Status: Tracks the individual status of each item line.
3. Export & Customization
The system is designed to provide clean, report-ready data for external inventory audits.
- CSV / Excel Export: Ideal for calculating additional job costs or material waste percentages.
- PDF Export: Useful for creating fixed audit trails for quality management systems (QMS).
- Column Selector: Tailor the report by hiding fields that aren't relevant to your current audit (e.g., hide Reject Reason for approved-only reports).
Summary
The Additional Material Request Report improves shop floor accountability by:
- Tracking deviations from the standard production BOM.
- Providing a clear trail of justification (Request Reasons) for extra consumption.
- Linking material costs directly to specific Production Orders.
- Enabling managers to identify patterns of material waste or inventory discrepancies.